NVWA audit: full supply chain traceability in under 10 minutes

Laatst bijgewerkt op 15-11-26

Geschreven door Avstarna

Dit is een artikel van onze eigen redactie

In short: with Avstarna's track-and-trace you can follow any finished product back to the raw ingredients it was made from, and forward to every customer who received it, in under 10 minutes. That is exactly what a full supply chain traceability check in an NVWA audit asks for, and it keeps you comfortably inside the 4-hour window if you ever have to report a real product recall.

Why traceability is the heart of an NVWA audit

The NVWA (the Netherlands Food and Consumer Product Safety Authority) looks at many things during an audit: hygiene, HACCP, allergen control, labelling. For a food manufacturer one checkpoint stands out, because it is both the most critical and the most time-consuming: traceability.

The auditor picks a finished product and asks you to trace it in both directions:

  • Backward: from the finished goods to every raw ingredient that went into that batch, with the supplier, the delivery and the batch or lot number.
  • Forward: from that same batch to every customer who received it, with date and quantity.

EU food law (the General Food Law, Regulation (EC) No 178/2002) requires "one step back, one step forward". An auditor who wants proof that it really works will ask for the whole chain, from procurement to final delivery, and will want to see it now, not tomorrow. For many producers this audit only comes around once every two years, so there is little room for a bad day.

Why tracing takes so long without the right system

On paper or in spreadsheets, a trace is detective work. You look for the production sheet, find the ingredient lot in a goods-received folder, call a supplier, then dig through delivery notes and invoices to see who got which boxes. Every handover between those documents is a place where a batch number was not written down, or was copied wrongly.

  • Production sheets, receiving notes, delivery notes and invoices live in different places.
  • Batch numbers are retyped by hand, so one typo breaks the chain.
  • Only one or two people know where everything is kept.
  • A trace that should take minutes takes half a day, and you are never completely sure it is complete.

In a real recall this is more than an inconvenience. It is the clock that decides how much product stays with your customers.

How Avstarna makes full traceability a 10-minute job

The trick is not a clever report at the end. It is logging the right facts at the moment they happen, once, so the chain is already complete when somebody asks for it.

  • Receiving ingredients. Goods are booked in with supplier, batch or lot number and best-before date, by scanning barcodes or QR labels.
  • Production. Every production run gets a production batch number (PBN), recorded with the product and the production date and tied to what went into it.
  • Packing and picking. Boxes are scanned on the way out, so the system knows exactly which batch went into which order.
  • Delivery. The digital packing slip and the signature on delivery link that order to the customer.

When the question comes, you open the batch and see both directions in one place: where the ingredients came from and where the finished product went. No folders, no phone calls, no retyping.

What a 10-minute trace simulation looks like

Do not wait for the auditor to find out. Run the exercise yourself, as often as you like:

  • Step 1: pick a batch. Choose any finished product batch, for example one from last month.
  • Step 2: trace backward. Open the batch and list the raw ingredients, their suppliers and their lot numbers.
  • Step 3: trace forward. List every customer and delivery that received the batch, with dates and quantities.
  • Step 4: show the result. Print or export it, exactly as you would hand it to an inspector.

With accurate data logging this takes under 10 minutes from the first click to a complete answer. Running it regularly also shows you where a scan or a batch number is still missing, long before an audit does.

Why the 4-hour window matters

When a product has to be recalled, you have to report quickly. Four hours is the window we work to. The minutes you save on the trace are minutes you can spend on what actually matters: stopping shipments, informing customers and getting product back. If the trace itself takes minutes, the 4-hour window stops being a threat and becomes a margin.

Accurate logging is the whole secret

We would rather be honest: software cannot trace what nobody logged. Avstarna gives you the structure, the scanners and one place to record it, but a trace is only as good as the data behind it. Scan when goods arrive. Enter the batch at production. Scan when you pick. The teams that do this as part of the normal day, not as extra admin before an audit, are the ones that trace in minutes.

And no software can promise you pass an audit. What it can do is make sure you can show your answers, calmly and fast.

Hours back, not jobs lost

Tracing is only one of the repeat tasks that eat time in a food factory. Audit preparation, retyping orders, making packing slips and chasing paperwork all add up. For many manufacturers the hours that come back can add up to about two full-time positions a year, depending on size and on how much is still on paper today. We explain where those hours go in How Avstarna can save you up to 2 employees. That time is also what makes a reliable system affordable for a small or mid-sized producer: you replace a lot of manual work with one system, not a heavy ERP project.

Want to see how a small manufacturer did it? Read the Mutiara BV interview, or look at what we are building on the roadmap.

Frequently asked questions

What is full supply chain traceability?
It is the ability to follow a product in both directions: backward from the finished goods to the raw ingredients and their suppliers, and forward to every customer who received it. In the food industry it is also called track and trace.

How long should a traceability check take?
As short as possible. On paper or in spreadsheets a full trace can take hours or half a day. With accurate data logging in Avstarna, a full trace simulation takes under 10 minutes.

What is the NVWA?
The NVWA is the Netherlands Food and Consumer Product Safety Authority (Nederlandse Voedsel- en Warenautoriteit). It inspects food companies, and traceability is one of the things an auditor will ask you to demonstrate.

Does software guarantee that I pass an NVWA audit?
No software can promise that. What Avstarna does is make sure you can show your traceability quickly, completely and calmly. Passing depends on your whole food safety system.

Is Avstarna suitable for small food manufacturers?
Yes. Avstarna was built together with a small snack manufacturer and is made for small and mid-sized producers who want a reliable system without the cost and complexity of a heavy ERP project.

How many hours can a manufacturer save?
It depends on your size and how much is still on paper today. For many manufacturers the repeat work that disappears (tracing, audit preparation, retyping orders, packing slips and invoices) can add up to about two full-time positions a year.

The bottom line

During our once-every-two-years NVWA audit, full supply chain traceability is both the most critical and the most time-consuming checkpoint. We are required to trace seamlessly from end to end: finished goods backward to the procurement of raw ingredients, and forward to the final delivery to the customer.

By using Avstarna's track-and-trace with accurate data logging, we can complete a full trace simulation in under 10 minutes. That drastic reduction means that in an actual product recall, we can comfortably beat the mandatory 4-hour reporting window with full confidence.

Request access and try a trace with your own batches.

Meest gekozen

Complete

De hele stroom, van de productievloer tot de factuur.

€ 1.495 /maand

Excl. btw, contract van 12 maanden

Meld je aan vóór het einde van 2026 en krijg 3 maanden 50% korting.

Geldt voor de maandprijs van het Complete pakket.

Actie eindigt op 31 december 2026